Statutory inspections run on dates, not memory
Enter building use, last inspection dates and the quotes you received. We recompute the next due dates for elevator periodic inspection (annual; six-monthly after 25 years; biennial for freight lifts), precision inspection, fire self-inspection and electrical inspection (2–4 years), show days remaining and lapse risk, then compare vendor quotes line by line.
Free without signup · nothing stored · not legal advice
Elevator Safety Act Rule 54
Fire Facilities Act 22, 58
Electrical Safety Act Rule 4
How it works
The statutory cycles are encoded directly: a lapsed date shows immediately.
Enter the building and history
Use, area, floors, lift type and dates, fire inspection date, electrical capacity and date.
Compute the next due dates
Lift 1/2 years or 6 months, precision inspection at 15 years then every 3, fire annual, electrical 2–4 years.
Take the calendar and quotes
12-month calendar, lapse and penalty exposure, quote comparison, vendor questionnaire.
What it checks
The costliest facility mistake is remembering "we did it last year".
Elevator periodic inspection
Last date + 1 year; auto-switches to 6 months after 25 years and 2 years for freight or car lifts.
Rule 54
Precision inspection
At 15 years from installation, then every 3 years.
Act 32
Fire self-inspection
Annual operation and comprehensive checks; six months later an operation check again.
Rule Annex 3
Electrical inspection
2 years for multi-use, 3 years standard, 4 with a PSSR.
Annex 4
Penalty exposure
Skipping fire inspection: up to 1 year or ₩10m; late reporting ₩0.5–2m.
Act 58
Quote comparison
Low, average and high per item, with gaps over 30% flagged.
practice
Pricing
The check is free. Subscriptions run 31 days from the payment day.
시설 상시관리
건물 20동 · 점검 알림 · 업체 견적 벤치마크
- 건물 20동 관리
- 점검 기한 알림
- 업체별 단가 벤치마크
- 대리인 공유 링크
- 우선 지원
Outside Korea — card via Payhip
Same engine, English report.
Team / agency
Multiple sites, API, white-label reports.
Questions
Is elevator inspection every six months?
No — annually by default. Six months applies after 25 years or within 2 years of a serious incident; two years applies to freight, car and dumbwaiter lifts and single-family homes.
What happens if we miss the window?
The window is ±30 days around the due date. Past it the lift cannot run, and running it invites penalties. Book a month ahead.
What decides fire inspection scope?
Sprinklered buildings, 5,000㎡ with water-spray systems and 2,000㎡ with certain multi-use businesses need comprehensive checks; six months later an operation check follows.
Is the electrical cycle 2 or 3 years?
2 years for hospitals, theatres, hotels, large retail, baths and karaoke; 3 years for other high-voltage consumers; 4 with a PSSR. Inspections cluster around February.
How do I know a quote is fair?
Get two or three quotes for the same scope. The engine shows low, average and high and flags gaps above 30% — but scope differences can invalidate a pure price comparison.
IntelliFacility compares the building and inspection history you enter against published statutory cycles to estimate due dates. Actual scope and deadlines are decided by the competent authority. Not legal advice.